What is beach nourishment?
Beach nourishment is the process of pumping sand onto an eroding shoreline to widen the existing beach. Sources of sand may include a nearby sandbar, a dredged source (such as an inlet or waterway), or an offshore borrow site along the ocean floor. The widened shoreline provides increased defense from coastal storms and beach erosion, protecting property, communities, and infrastructure that are located along the coast.
While the Outer Banks coastline is beautiful, it is also very fragile. Storms, high winds and tidal changes all contribute to beach erosion. To restore and preserve our fragile coastline, Dare County and the towns of Duck, Kitty Hawk, Southern Shores, Kill Devil Hills and Nags Head have implemented important beach nourishment projects important that are critical to the future of our communities.
We apologize in advance for any inconvenience this causes and are confident you understand the importance and necessity of this project so you can continue to return and enjoy the Outer Banks beaches for many years to come. We hope you will choose to make the best of your vacation should you find your stay impacted by the beach nourishment project.
Seaside Vacations cannot predict when or where these jobs will begin or how long they will last. Since we have no control over these situations, no compensation or moves to other properties are possible.
2022 Outer Banks Beach Nourishment Plans
Beach nourishment projects require management as time goes on. The next round of re-nourishment is tentatively planned for 2022 in the towns of Duck, Southern Shores, Kitty Hawk, Kill Devil Hills, and Nags Head.
Projected 2022 Beach Nourishment Schedules*:
*All projects are scheduled to take place this year. As contractors provide tentative construction schedules, this table will be updated. Please check back for more information and sign up for area-specific email updates using the links listed below.
During equipment staging, contractors begin placing distribution pipeline and staging heavy equipment.
Nags Head’s project is planned for a tentative timeframe beginning early July of 2022 with a projected completion of about 30 days after the project begins. It will take place on the beach between Milepost 16 near Jennette’s Pier and the town line less than five miles to the south. A tentative project schedule and map may become available in the spring of 2022 for the Nags Head project.
- Approximately 4.45 miles of shoreline from 8031 South Oregon Inlet Road (near Milepost 16) to 10435 South Oregon Inlet
- Click here for more information about the project in the Town of Nags Head.
- Click here to view the Town of Nags Head project map.
Duck's project is planned for a tentative timeframe beginning early October with a projected completion of about 20-30 days after the project begins.
- Approximately 1.6 miles of shoreline from the Army Corps Pier north to Skimmer Way.
- Click here for more information about the project in the Town of Duck.
- Click here to view the Town of Duck project map.
Southern Shores' project is planned for a tentative timeframe beginning early September with a projected completion of about 35-40 days after the project begins.
- Approximately 3.8 miles of shoreline from the Duck/Southern Shores town line to the Southern Shores/Kitty Hawk town line.
- Click here for more information about the project in the Town of Southern Shores.
- Click here to view the Town of Southern Shores project map.
Kitty Hawk's project is planned for a tentative timeframe beginning mid-July with a projected completion of about 35-45 days after the project begins.
- Approximately 3.97 miles of shoreline from the Southern Shores/Kitty Hawk town line to the Kitty Hawk/Kill Devil Hills line.
- Click here for more information about the project in the Town of Kitty Hawk.
- Click here to view the Town of Kitty Hawk project map.
Kill Devil Hills' project is planned for a tentative timeframe beginning mid-June with a projected completion of about 25-35 days after the project begins.
- Approximately 2.74 miles of shoreline from the Kitty Hawk/Kill Devil Hills town line to 270 feet north of Prospect Avenue.
- Click here to view the Town of Kill Devil Hills project map.
More Information About Beach Nourishment
Sand will be pumped onto the shoreline by offshore dredges to widen the existing beaches, which have suffered from erosion in many places. The goal of these beach nourishment projects is to replenish and protect the homes and beaches we all love, from coastal storms that threaten our shoreline. These projects will be completed in sections to minimize the impact on visitors to the area and ensure that the beaches are still accessible for your enjoyment.
About 1,000 feet of the beach will be directly impacted during construction at any one time and a portion of this area may be closed. Construction is anticipated to impact oceanfront properties between 3-5 days. Once a section is pumped into place it should be re-opened for use within 24-48 hours. Sand ramps will be placed over a temporary pipeline at every public access and then in intervals of no more than 200-300 feet, allowing people to get across and enjoy the beach seaward of the pipeline. There will be a wide beach after nourishment, giving people large areas seaward of the pipeline to enjoy.
We apologize in advance for any inconvenience this causes and are confident you understand the importance and necessity of this project so you can continue to return and enjoy the Outer Banks beaches for many years to come. We hope you will choose to make the best of your vacation should you find your stay impacted by the beach nourishment project.
The current beach nourishment schedule can be found at DareNC.com.
We encourage you to sign up for email updates from the towns and receive the most current construction information straight to your inbox or check DareNC.com for updates.